EF2026-cost-data-electricity (French, CSV)

EF2026-cost-data-electricity: live French CSV table. Filter, chart and export up to 10,000 rows as CSV. From Canada Energy Regulator, updated Sep 2026.

Format
CSV
Access
Live table (filter, chart, export)
Size
35,061,780 bytes
Publisher-reported update
2026-09-24

The Canada Energy Regulator’s (CER) Canada’s Energy Future 2026: Cost and Performance Parameters for Electricity Generation and Storage Technologies dataset provides the assumptions underpinning the electricity sector projections in Canada’s Energy Future 2026: Energy Supply and Demand Projections to 2050. The dataset includes cost and performance parameters for electricity generation and storage technologies across all Canadian provinces and territories. Also, the data is available by all scenarios and projection years in Canada’s Energy Future 2026. It contains capital costs, operating costs, connection costs, efficiency, construction timelines, facility lifetimes, and carbon capture performance where applicable. These parameters are developed by CER staff using a combination of Canadian and international data sources and are adjusted to reflect regional conditions, technology characteristics, and scenario-specific assumptions. By publishing these inputs, the CER supports transparency in its modelling and provides users with the information needed to better understand, reproduce, and analyze the energy futures explored in Canada’s Energy Future 2026.

Access original file

Data overview

Formats
CSV
File languages
French
Available actions
Query table · Access original file

Official sources and licences

Related open data