High Priority Requisition Supply Records for the West Coast Royal Canadian Navy Fleet (English, CSV)

High Priority Requisition Supply Records for the West Coast Royal Canadian Navy Fleet: live English CSV table. Filter, chart and export up to 10,000 rows as CSV. From National Defence, updated Dec 2024.

Format
CSV
Access
Live table (filter, chart, export)
Size
3,347,530 bytes
Publisher-reported update
2024-12-09

A sanitized data set on how the Royal Canadian Navy tracks high priority requisitions. The movement of parts between multiple private (ie DRMIS, CGCS) and public (ie Purolator) information systems necessitates the creation of a tracking spreadsheet manually maintained by dedicated naval supply technicians. This dataset will no longer be updated as the data is no longer collected.

Access original file

Data overview

Formats
CSV
File languages
English
Available actions
Query table · Access original file

Sample rows

The first 10 rows, as CanQuery read them from the publisher's live table on 2026-11-16. Showing 20 of 26 columns. The table has 12,698 rows.

OPDEF NumberHPR Msg NumberMsg DateReply Msg NumberReceipt Msg NumberStock CodeQTYRDDDescriptionUrgent ReqNil National StockNext Higher AssyDate RecievedStatusWO NumberSTO NumberIssued byFMF Job ForDate ShippedEDD
EMAIL07/02/2018N/AN/A5008/02/2018CABLE, POWER, ELECTRICALFALSEFALSE09/02/201808 Feb - 002E, Del# 8003272400.8203986044703649506002ECHICOUTIMI
Email29/08/2017N/AN/A99-1738153129/08/2017VALVE, BALLFALSEFALSE31/08/201731 Aug - Iss'd 31 Aug - Iss'd on 2227 until EMR is attached. 29 Aug - FMFCB HPR to replace CSF1988203881974702863760002ECHICOUTIMI
MWVS15505/12/2011HPR 537CCD 184/MWVS31601-06201231Circuit Card AssyTRUEFALSE26/07/201126 Jul: receipt msg rec'd. 25 Jul: SM hastened. 11 Jul SM Hastened. 4 Jul: SM hastened. 22 Jun TA engaged about repairs.13Jun SM hastened ref status and EDD. 28 May: PDO and Ref no EDD yet. 22 May SM
HPR MsgMWVS14101/12/2011DST 292MWVS213(Cancelled)01-11289911Module AssyFALSETRUE02/05/20122May, Cancelled as per MSG.23-30 Apr mog 4 Hastened. 17 Apr,Mog 4 engaged.11 Apr: Awaiting cancellation msg. 26 Mar,19 Mar,13 Mar,07 Mar, SM hastened.01 Mar: SM states no EDD yet. 29 Feb: SM Hastened.
21/03/201201-2027751410Cable, Power, ElectricalFALSETRUE24/05/201224 May, Completed as per SM e-mail18 Apr: SM states ent to COLOG EDD 28 May 12. 17 Apr, SM engaged.11 Apr,SM hastened.03 Apr: SM Hastened. 27 Mar: SM Hastened. 21 Mar: Item now Pri 1, Nil National st820167435HMCS Regina
09/03/201201-22953432Circuit Card AssemblyFALSEFALSE23/03/201223 Mar: Complete. 09 Mar: AV A6018201572564700249503
MS003-12 251344Z06/03/2012DST 12-023ALGSUP044-1201-26305321Charger, BatteryFALSETRUE02 Apr: EDD 23 Apr 12. 26 Mar: Item should have been delivered on the 23, awaiting rec ack. 19 Mar: Working on req as of CAT 3, see emails. 13 Mar: MTF fr SM. 06 Mar: Nil National Stk, SM engaged.MSE
CSE014-12OTT 048523/03/2012DST 035OTT 071001-35699461Amplifier, VideoFALSEFALSE08/05/20128 May: Complete. 4 May,sent to ship.1 May, shipped from B701. 27,Ship input new DRMIS WO and sent 24 Apr,SM hasten ref EDD.19 Apr, SM waiting for a REQ number for the PRR18 Apr: SM Hastened.CSE
MS068-11VAN 002902/01/2012HPR 12-004VAN 048601-37339761Flow SwitchFALSETRUE27/03/201227 Mar: Complete. 3 Jan: SM indicates PO W8482-4500899195, supplier states 12 wk delivery (~30 Mar 12). 2 Jan: Nil Nat'l Stk, SM Engaged.MSE
MSO009-12OTT 042014/03/2012HPR 12-054OTT 042001-45348221Door AssemblyFALSEFALSE02/04/201202 Apr:Completed Item sent to ship awaiting rec ack msg. 26 Mar: item arrived at B202. SS emailed. 22 Mar: Fin Code sent to B701 to send item. 21 Mar: Ship queried for more info. 14 Mar: AV B701MSE

Official sources and licences

Related open data