Zoning Bylaw Amendment Interim Control 10 2019 (English, CSV)
Explore the interactive map. Zoning Bylaw Amendment Interim Control 10 2019: English CSV file you can open as a table, filter, chart and export up to 10,000 rows. From City of Burlington, updated Dec 2022.
- Format
- CSV
- Access
- Table on demand (prepared when opened) and interactive map
- Fields
- 7
- Publisher-reported update
- 2022-12-20
The ICBL temporarily restricts the development of lands within a study area for a period of one year, with a maximum extension of a second year. This layer represents the lands where ICBL 10-2019 is in effect. The lands in the study area include the lands in proximity to the Burlington GO Station. During the one-year “freeze” on development in the study area, the City will complete a land-use study to: Assess the role and function of the downtown bus terminal and the Burlington GO station on Fairview Street as Major Transit Station Areas -Examine the planning structure, land use mix and intensity for the lands identified in the study area -Update the Official Plan and Zoning bylaw regulations as needed for the lands identified in the study area.
Data overview
- Formats
- CSV
- File languages
- English
- Available actions
- Explore table (prepared automatically) · Explore map · Access original file
Available fields (7/7)
Fields from the recorded map schema.
| Field | Recorded type |
|---|---|
| FID | esriFieldTypeOID |
| OBJECTID | esriFieldTypeInteger |
| NAME | esriFieldTypeString |
| EFFECTIVED | esriFieldTypeDate |
| AREAHA | esriFieldTypeDouble |
| SOURCE | esriFieldTypeString |
| GlobalID | esriFieldTypeGlobalID |