Duration and volumes spilled in Excel format (French, XLSX)

Load this French XLSX resource into a live table: Duration and volumes spilled in Excel format.

Format
XLSX
Access
ingestable
Publisher-reported update
2026-05-27

During the month of November 2015, the City of Montreal carried out major maintenance work on the south-east interceptor, which required the latter to be put out of work. The result was a wastewater discharge whose duration and volume were estimated.

Access original file

Data overview

Formats
XLSX
File languages
French
Available actions
Load table · Access original file

Official sources and licences

Related open data