Conditions (English, CSV)
Conditions: English CSV file you can open as a table, filter, chart and export up to 10,000 rows. From Canada Energy Regulator, updated Sep 2026.
- Format
- CSV
- Access
- Table on demand (prepared when opened)
- Publisher-reported update
- 2026-09-25
The Canada Energy Regulator produces a table showing conditions from projects approved since 2010. This table lists conditions by company and by specific approval number. It also shows the current status of each condition. The conditions dataset is updated daily. This dataset is used in the Conditions on Energy Projects visualization tool on the Canada Energy Regulator website. The source code for the visualization tool is also available.
Data overview
- Formats
- CSV
- File languages
- English
- Available actions
- Explore table (prepared automatically) · Access original file
Sample rows
The first 10 rows, as CanQuery read them from the start of the publisher's file on 2026-11-08.
| Company | Project Name | Short Project Name | Project Status | Instrument Number | Instrument Activity | Effective Date | Issuance Date | Sunset Date | Instrument Status | Location | Condition Number | Condition | Condition Status | Condition Phase | Condition Type | Condition Filing | Theme(s) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1057533 Alberta Ltd. | 1057533 Alberta s. 58 application - to construct and operate Gething Source Water Pipeline Tie-in Project | Construct Gething Source Water Tie-in-1057533 | Completed | XG-Z027-002-2014 | 02/07/2014 | 02/07/2014 | 02/07/2015 | All Conditions/Requirements Met | Athabasca--Grande Prairie--Peace River/Alberta, Northeast /British Columbia | 1 | 1057533 Alberta Ltd. shall comply with all of the conditions contained in this Order unless the Board otherwise directs. | Closed | Includes all Phases of Constr. | Non Standard | Filing Required | Standard Condition | |
| 1057533 Alberta Ltd. | 1057533 Alberta s. 58 application - to construct and operate Gething Source Water Pipeline Tie-in Project | Construct Gething Source Water Tie-in-1057533 | Completed | XG-Z027-002-2014 | 02/07/2014 | 02/07/2014 | 02/07/2015 | All Conditions/Requirements Met | Athabasca--Grande Prairie--Peace River/Alberta, Northeast /British Columbia | 2 | 1057533 Alberta Ltd. shall cause the approved Project to be designed, located, constructed, installed, and operated in accordance with the specifications, standards, commitments made and other inform… | Closed | Includes all Phases of Constr. | Non Standard | Filing Required | Standard Condition, Integrity Management | |
| 1057533 Alberta Ltd. | 1057533 Alberta s. 58 application - to construct and operate Gething Source Water Pipeline Tie-in Project | Construct Gething Source Water Tie-in-1057533 | Completed | XG-Z027-002-2014 | 02/07/2014 | 02/07/2014 | 02/07/2015 | All Conditions/Requirements Met | Athabasca--Grande Prairie--Peace River/Alberta, Northeast /British Columbia | 3 | 1057533 Alberta Ltd. shall implement or cause to be implemented all of the policies, practices, programs, mitigation measures, recommendations, procedures and its commitments for the protection of th… | Closed | Includes all Phases of Constr. | Non Standard | Filing Required | Standard Condition, Environmental Protection | |
| 1057533 Alberta Ltd. | 1057533 Alberta s. 58 application - to construct and operate Gething Source Water Pipeline Tie-in Project | Construct Gething Source Water Tie-in-1057533 | Completed | XG-Z027-002-2014 | 02/07/2014 | 02/07/2014 | 02/07/2015 | All Conditions/Requirements Met | Athabasca--Grande Prairie--Peace River/Alberta, Northeast /British Columbia | 4 | At least 14 days prior to construction, 1057533 Alberta Ltd. shall file with the Board, a project-specific construction safety manual. | Closed | Prior to the Construction Phase | Standard | Filing Not Required | Safety Management | |
| 1057533 Alberta Ltd. | 1057533 Alberta s. 58 application - to construct and operate Gething Source Water Pipeline Tie-in Project | Construct Gething Source Water Tie-in-1057533 | Completed | XG-Z027-002-2014 | 02/07/2014 | 02/07/2014 | 02/07/2015 | All Conditions/Requirements Met | Athabasca--Grande Prairie--Peace River/Alberta, Northeast /British Columbia | 5 | Within 30 days of the date that the approved Project is placed in service, 1057533 Alberta Ltd. shall file with the Board a confirmation that the approved Project was completed and constructed in com… | Closed | Post Construction Phase | Non Standard | Filing Not Required | Standard Condition | |
| 1057533 Alberta Ltd. | 1057533 Alberta s. 58 application - to construct and operate Gething Source Water Pipeline Tie-in Project | Construct Gething Source Water Tie-in-1057533 | Completed | XG-Z027-002-2014 | 02/07/2014 | 02/07/2014 | 02/07/2015 | All Conditions/Requirements Met | Athabasca--Grande Prairie--Peace River/Alberta, Northeast /British Columbia | 6 | Unless the Board otherwise directs prior to 7 February 2015, this Order shall expire on 7 February 2015 unless the Project has commenced by that date. | Closed | Expiry Date of Reg. Instr. | Standard | Filing Required | Sunset Clause | |
| 1057533 Alberta Ltd. | 1057533 Alberta Ltd. application to abandon the Shekilie Pipeline. | 1057533 Alberta Ltd. application to abandon the Shekilie Pipeline. | In Progress | ZO-003-2020 | Shekilie Pipeline Abandonment application (s.241) | 08/18/2020 | 08/18/2020 | In Progress | Athabasca--Grande Prairie--Peace River/Alberta | 1 | <p>1057533 Alberta Ltd., must comply with all of the conditions contained in this Order, unless the Commission otherwise directs.</p> | Closed | Abandonment | Non Standard | Filing Required | Standard Condition | |
| 1057533 Alberta Ltd. | 1057533 Alberta Ltd. application to abandon the Shekilie Pipeline. | 1057533 Alberta Ltd. application to abandon the Shekilie Pipeline. | In Progress | ZO-003-2020 | Shekilie Pipeline Abandonment application (s.241) | 08/18/2020 | 08/18/2020 | In Progress | Athabasca--Grande Prairie--Peace River/Alberta | 2 | <p>1057533 Alberta Ltd., must cause the Project to be abandoned in accordance with the specifications, standards, commitments made and other information referred to in its Application or in its relat… | Closed | Abandonment | Non Standard | Filing Required | Standard Condition | |
| 1057533 Alberta Ltd. | 1057533 Alberta Ltd. application to abandon the Shekilie Pipeline. | 1057533 Alberta Ltd. application to abandon the Shekilie Pipeline. | In Progress | ZO-003-2020 | Shekilie Pipeline Abandonment application (s.241) | 08/18/2020 | 08/18/2020 | In Progress | Athabasca--Grande Prairie--Peace River/Alberta | 3 | <p>1057533 Alberta Ltd., must implement or cause to be implemented, all of the policies, practices, programs, mitigation measures, recommendations, procedures and its commitments for the protection o… | Closed | Abandonment | Standard | Filing Required | Standard Condition | |
| 1057533 Alberta Ltd. | 1057533 Alberta Ltd. application to abandon the Shekilie Pipeline. | 1057533 Alberta Ltd. application to abandon the Shekilie Pipeline. | In Progress | ZO-003-2020 | Shekilie Pipeline Abandonment application (s.241) | 08/18/2020 | 08/18/2020 | In Progress | Athabasca--Grande Prairie--Peace River/Alberta | 4 | <p>1057533 Alberta Ltd., must file with the CER, <strong>at least 60 days prior to </strong><strong>commencing physical abandonment activities</strong>:</p><p>a) a Phase I Environmental Site Assessme… | Closed | Abandonment | Standard | Filing Not Required | Environmental Protection |