The Canada Energy Regulator produces a table showing conditions from projects approved since 2010. This table lists conditions by company and by specific approval number. It also shows the current status of each condition. The conditions dataset is updated daily. This dataset is used in the Conditions on Energy Projects visualization tool on the Canada Energy Regulator website. The source code for the visualization tool is also available.

Access original file

Data overview

Formats
CSV
File languages
English
Available actions
Explore table (prepared automatically) · Access original file

Sample rows

The first 10 rows, as CanQuery read them from the start of the publisher's file on 2026-11-08.

CompanyProject NameShort Project NameProject StatusInstrument NumberInstrument ActivityEffective DateIssuance DateSunset DateInstrument StatusLocationCondition NumberConditionCondition StatusCondition PhaseCondition TypeCondition FilingTheme(s)
1057533 Alberta Ltd.1057533 Alberta s. 58 application - to construct and operate Gething Source Water Pipeline Tie-in ProjectConstruct Gething Source Water Tie-in-1057533CompletedXG-Z027-002-201402/07/201402/07/201402/07/2015All Conditions/Requirements MetAthabasca--Grande Prairie--Peace River/Alberta, Northeast /British Columbia11057533 Alberta Ltd. shall comply with all of the conditions contained in this Order unless the Board otherwise directs.ClosedIncludes all Phases of Constr.Non StandardFiling RequiredStandard Condition
1057533 Alberta Ltd.1057533 Alberta s. 58 application - to construct and operate Gething Source Water Pipeline Tie-in ProjectConstruct Gething Source Water Tie-in-1057533CompletedXG-Z027-002-201402/07/201402/07/201402/07/2015All Conditions/Requirements MetAthabasca--Grande Prairie--Peace River/Alberta, Northeast /British Columbia21057533 Alberta Ltd. shall cause the approved Project to be designed, located, constructed, installed, and operated in accordance with the specifications, standards, commitments made and other inform…ClosedIncludes all Phases of Constr.Non StandardFiling RequiredStandard Condition, Integrity Management
1057533 Alberta Ltd.1057533 Alberta s. 58 application - to construct and operate Gething Source Water Pipeline Tie-in ProjectConstruct Gething Source Water Tie-in-1057533CompletedXG-Z027-002-201402/07/201402/07/201402/07/2015All Conditions/Requirements MetAthabasca--Grande Prairie--Peace River/Alberta, Northeast /British Columbia31057533 Alberta Ltd. shall implement or cause to be implemented all of the policies, practices, programs, mitigation measures, recommendations, procedures and its commitments for the protection of th…ClosedIncludes all Phases of Constr.Non StandardFiling RequiredStandard Condition, Environmental Protection
1057533 Alberta Ltd.1057533 Alberta s. 58 application - to construct and operate Gething Source Water Pipeline Tie-in ProjectConstruct Gething Source Water Tie-in-1057533CompletedXG-Z027-002-201402/07/201402/07/201402/07/2015All Conditions/Requirements MetAthabasca--Grande Prairie--Peace River/Alberta, Northeast /British Columbia4At least 14 days prior to construction, 1057533 Alberta Ltd. shall file with the Board, a project-specific construction safety manual.ClosedPrior to the Construction PhaseStandardFiling Not RequiredSafety Management
1057533 Alberta Ltd.1057533 Alberta s. 58 application - to construct and operate Gething Source Water Pipeline Tie-in ProjectConstruct Gething Source Water Tie-in-1057533CompletedXG-Z027-002-201402/07/201402/07/201402/07/2015All Conditions/Requirements MetAthabasca--Grande Prairie--Peace River/Alberta, Northeast /British Columbia5Within 30 days of the date that the approved Project is placed in service, 1057533 Alberta Ltd. shall file with the Board a confirmation that the approved Project was completed and constructed in com…ClosedPost Construction PhaseNon StandardFiling Not RequiredStandard Condition
1057533 Alberta Ltd.1057533 Alberta s. 58 application - to construct and operate Gething Source Water Pipeline Tie-in ProjectConstruct Gething Source Water Tie-in-1057533CompletedXG-Z027-002-201402/07/201402/07/201402/07/2015All Conditions/Requirements MetAthabasca--Grande Prairie--Peace River/Alberta, Northeast /British Columbia6Unless the Board otherwise directs prior to 7 February 2015, this Order shall expire on 7 February 2015 unless the Project has commenced by that date.ClosedExpiry Date of Reg. Instr.StandardFiling RequiredSunset Clause
1057533 Alberta Ltd.1057533 Alberta Ltd. application to abandon the Shekilie Pipeline.1057533 Alberta Ltd. application to abandon the Shekilie Pipeline.In ProgressZO-003-2020Shekilie Pipeline Abandonment application (s.241)08/18/202008/18/2020In ProgressAthabasca--Grande Prairie--Peace River/Alberta1<p>1057533 Alberta Ltd., must comply with all of the conditions contained in this Order, unless the Commission otherwise directs.</p>ClosedAbandonmentNon StandardFiling RequiredStandard Condition
1057533 Alberta Ltd.1057533 Alberta Ltd. application to abandon the Shekilie Pipeline.1057533 Alberta Ltd. application to abandon the Shekilie Pipeline.In ProgressZO-003-2020Shekilie Pipeline Abandonment application (s.241)08/18/202008/18/2020In ProgressAthabasca--Grande Prairie--Peace River/Alberta2<p>1057533 Alberta Ltd., must cause the Project to be abandoned in accordance with the specifications, standards, commitments made and other information referred to in its Application or in its relat…ClosedAbandonmentNon StandardFiling RequiredStandard Condition
1057533 Alberta Ltd.1057533 Alberta Ltd. application to abandon the Shekilie Pipeline.1057533 Alberta Ltd. application to abandon the Shekilie Pipeline.In ProgressZO-003-2020Shekilie Pipeline Abandonment application (s.241)08/18/202008/18/2020In ProgressAthabasca--Grande Prairie--Peace River/Alberta3<p>1057533 Alberta Ltd., must implement or cause to be implemented, all of the policies, practices, programs, mitigation measures, recommendations, procedures and its commitments for the protection o…ClosedAbandonmentStandardFiling RequiredStandard Condition
1057533 Alberta Ltd.1057533 Alberta Ltd. application to abandon the Shekilie Pipeline.1057533 Alberta Ltd. application to abandon the Shekilie Pipeline.In ProgressZO-003-2020Shekilie Pipeline Abandonment application (s.241)08/18/202008/18/2020In ProgressAthabasca--Grande Prairie--Peace River/Alberta4<p>1057533 Alberta Ltd., must file with the CER, <strong>at least 60 days prior to </strong><strong>commencing physical abandonment activities</strong>:</p><p>a) a Phase I Environmental Site Assessme…ClosedAbandonmentStandardFiling Not RequiredEnvironmental Protection

Official sources and licences

Related open data