Ontario Builds: Health care (English, CSV)
Ontario Builds: Health care: English CSV file you can open as a table, filter, chart and export up to 10,000 rows. From Government of Ontario, updated Oct 2026.
- Format
- CSV
- Access
- Table on demand (prepared when opened)
- Publisher-reported update
- 2026-10-28
This is a sample of key infrastructure projects happening in Ontario. Projects will be added and updated on an ongoing basis. The dataset includes: * project name * category * geography * status * target completion date * description * result * area * region * address * postal code * highway / transit line * estimated budget * funding sources
Data overview
- Formats
- CSV
- File languages
- English
- Available actions
- Explore table (prepared automatically) · Access original file
Sample rows
The first 10 rows, as CanQuery read them from the start of the publisher's file on 2026-11-08. Showing 20 of 21 columns.
| Category | Supporting Ministry | Community | Project | Status | Target Completion Date | Description | Result | Area | Region | Address | Postal Code | Highway / Transit Line | Estimated Total Budget ($) | Municipal Funding | Provincial Funding | Federal Funding | Other Funding | Website | Latitude |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Health care | Health | Atikokan | Atikokan General Hospital - Renovation and Expansion | Complete | July 2017 | Renovating roughly 8,500 sq. ft. and adding roughly 10,000 sq. ft. | More space for 11 acute-care and other types of beds, as well as improved air handling, boiler and sprinkler systems | Rainy River | Northwest | 120 Dorothy St | P0T 1C0 | 0 | Yes | Yes | 48.753595 | ||||
| Health care | Health | Barrie | Royal Victoria Regional Health Centre - PET-CT Scanner | Complete | February 2024 | The project will implement a new Positron Emission Eomography (PET) and Computed Tomography (CT) scanner. | The PET/CT scanner will provide patients of RVH’s Simcoe Muskoka Regional Cancer Program (SMRCP) and cardiovascular care program better access to PET/CT imaging, at a location closer to home. | Simcoe | Central | 201 Georgian Dr | L4M 6M2 | 1400300 | Yes | Yes | 44.415046 | ||||
| Health care | Health | Barrie | The Royal Victoria Hospital of Barrie - Phase 1 Redevelopment | Complete | July 2013 | Construction of 4 bunker-3 machines at the Simcoe Muskoka Regional Cancer Centre (SMRCC) and the Phase 1 redevelopment of the Royal Victoria Hospital. | An additional 101 inpatient beds, expanded emergency and ambulatory care, two new operating rooms as well as enhancements to related services such as laboratory and diagnostic imaging. | Simcoe | Central | 201 Georgian Dr | L4M 6M2 | 0 | 44.415046 | ||||||
| Health care | Health | Barrie | Royal Victoria Regional Health Centre - New Critical Care Unit | Planning | October 2027 | The project will convert available space on the 3rd floor into additional new critical care space. | Maintenance of building infrastructure in a state of good repair. | Simcoe | Central | 201 Georgian Dr | L4M 6M2 | 0 | Yes | Yes | 44.414966 | ||||
| Health care | Health | Barrie | Royal Victoria Regional Health Centre - 5th Linear Accelerator Project | Planning | To Be Determined | The project will build an additional LINAC (Linear Accelerator) into an existing operational bunker space | The project will increase capacity of existing cancer treatment services at the current hospital site. | Simcoe | Central | 201 Georgian Dr | L4M 6M2 | 0 | Yes | Yes | 44.414966 | ||||
| Health care | Health | Barrie | Royal Victoria Regional Health Centre - RVH Community Dialysis | Planning | October 2027 | The project will renovate and expand the community dialysis unit located at Wellingston St in Barrie. Phase 1 includes water treatment systems. The second phase expands the tratment capacity from fro… | Expansion of service service capacity | Simcoe | Central | 66 Wellington St W. | L4N 8J6 | 0 | Yes | Yes | 44.3924592 | ||||
| Health care | Health | Barrie | ROYAL VICTORIA REGIONAL HEALTH CENTRE - HIRF Grant | Under construction | To Be Determined | Grant for replacement and maintenance of infrastructure | Maintenance of building infrastructure in a state of good repair. | Simcoe | Central | 201 Georgian Dr | L4M 6M2 | 0 | 44.414966 | ||||||
| Health care | Health | Belleville | Quinte Health - Trenton Expansion and Redevelopment of Emergency Department | Planning | April 2030 | The Project involves the expansion and redevelopment of the main Emergency Department at the Hospital's Trenton site. | The Project will address aging infrastructure and design deficiencies at the Emergency Department, and will support increased visit volumes. | Hastings | East | 242 King St | K8V 5S6 | 0 | Yes | Yes | 44.11706578 | ||||
| Health care | Health | Belleville | Quinte Healthcare Corporation Renovation | Complete | February 2018 | Renovations to the medical device reprocessing department (MDRD) and central sterilization room. | Improved infection control, and enhanced preventive maintenance capabilities. | Hastings | East | 265 Dundas Street East | K8N 5A9 | 0 | Yes | Yes | 44.162698 | ||||
| Health care | Health | Belleville | Quinte Healthcare Corporation - Belleville Phase 2 and 3 | Complete | April 2014 | Demolition of a hospital wing, construction of 25 additional medical/surgical beds, expansion of the emergency services and the laboratory, relocation of acute mental health services, outpatient onco… | 0 | Hastings | East | 265 Dundas St E | K8N 5A9 | 57330761 | Yes | Yes | 44.162944 |