Contingency report - Infrastructure Department (French, CSV)
Contingency report - Infrastructure Department: French CSV file you can open as a table, filter, chart and export up to 10,000 rows. From Government and Municipalities of Québec, updated May 2026.
- Format
- CSV
- Access
- Table on demand (prepared when opened)
- Publisher-reported update
- 2026-05-27
Overview of the contingencies of contracts awarded since 2008 in connection with the Water Department and the Infrastructure, Road and Transport Department.
Data overview
- Formats
- CSV
- File languages
- French
- Available actions
- Explore table (prepared automatically) · Access original file
Sample rows
The first 10 rows, as CanQuery read them from the start of the publisher's file on 2026-11-09.
| Numéro d'appel d'offres | Production du Décompte final | Nature principale | Description | Date d'octroi | Valeur Contrat | Décomptes finals | Pourcentage dépensé | Quantités excédentaires | Pourcentage sur le total des contingences (Quantités excédentaires) | Items supplémentaires | Pourcentage sur le total des contingences (Item supplémentaires) | Contingences totales | Pourcentage de contingences |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1178 | 2013-01-09 | LAMP | FOURNITURE ET INSTALLATION D'UN SYSTÈME D'ÉCLAIRAGE ET MODIFICATION À LA SIGNALISATION LUMINEUSE DANS LA RUE SHERBROOKE ET DANS L'AVENUE DU MUSÉE. ARRONDISSEMENT: VILLE-MARIE. | 2011-07-06 | 176 267,00 | 164 221,00 | 0,931660 | - | - | 3 075,00 | 1,000000 | 3 075,00 | 0,018725 |
| 1145 | 2013-01-23 | PAVA | PLANAGE DE LA CHAUSSÉE D'ASPHALTE ET REVÊTEMENT BITUMINEUX, LÀ OÙ REQUIS, DANS LE BOULEVARD TOUPIN, DE LA RUE MARCEL AU BOULEVARD GOUIN. ARRONDISSEMENT: SAINT-LAURENT ET AHUNTSIC-CARTIERVILLE. CONTRA… | 2011-06-20 | 577 446,00 | 502 089,90 | 0,869501 | 20 470,73 | 0,368716 | 35 048,17 | 0,631284 | 55 518,90 | 0,110576 |
| 1211 | 2013-01-24 | EGOU | RECONSTRUCTION D'UNE CONDUITE D'EAU SECONDAIRE DANS LA RUE DELISLE, DE LA RUE ROSE-DE-LIMA À L'AVENUE GREENE. ARRONDISSEMENT: LE SUD-OUEST. | 2011-10-24 | 466 191,00 | 354 523,77 | 0,760469 | 5 833,28 | 0,295673 | 13 895,55 | 0,704327 | 19 728,83 | 0,055649 |
| 227601 | 2013-02-21 | LAMP | DÉPLACEMENT D'UN RELAIS D'ÉCLAIRAGE. ARRONDISSEMENT: MONTRÉAL-NORD. (DURÉE DES TRAVAUX REÇUE DE MARIE-FRANCE MONGENAIS LE 2013/02/15). | 2012-05-22 | 12 334,00 | 11 432,97 | 0,926947 | 85,60 | 0,077891 | 1 013,37 | 0,922109 | 1 098,97 | 0,096123 |
| 252303 | 2013-02-27 | EGOU | RÉHABILITATION PAR CHEMISAGE D'UNE CONDUITE D'EAU DE 300 MM DE DIAMÈTRE PASSANT SOUS L'AUTOROUTE 40, À LA HAUTEUR DE L'ENTRÉE MONTROSE. VILLE DE KIRKLAND. | 2012-08-23 | 343 200,00 | 245 835,00 | 0,716302 | - | - | 9 235,00 | 1,000000 | 9 235,00 | 0,037566 |
| 1231 | 2013-03-12 | EGOU | CONSTRUCTION D'UN ÉGOUT PLUVIAL ET D'UNE CONDUITE SECONDAIRE DANS LE PROLONGEMENT DU BOULEVARD MAURICE-DUPLESSIS, DE L'AVENUE ARMAND-CHAPUT AU BOULEVARD SAINT-JEAN BAPTISTE. ARRONDISSEMENT: RIVIÈRE D… | 2012-01-23 | 1 456 621,10 | 1 195 896,19 | 0,821007 | 85 361,20 | 0,598944 | 57 158,31 | 0,401056 | 142 519,51 | 0,119174 |
| 1213 | 2013-03-22 | LAMP | FOURNITURE ET INSTALLATION DE MOBILIER D'ÉCLAIRAGE TEMPORAIRE POUR LE RÉAMÉNAGEMENT DE L'AUTOROUTE BONAVENTURE SUR LES RUES DUKE ET NAZARETH, DE LA RUE WELLINGTON À LA RUE SAINT-PAUL OUEST. ARRONDISS… | 2011-11-23 | 165 097,23 | 149 606,92 | 0,906175 | 6 351,00 | 0,449715 | 7 771,27 | 0,550285 | 14 122,27 | 0,094396 |
| 1208 | 2013-04-08 | LAMP | FOURNITURE ET INSTALLATION DE MOBILIER D'ÉCLAIRAGE SUR LES RUES ST-LOUIS, NOTRE-DAME ET CHAMP-DE-MARS ENTRE GOSFORD ET BERRI INCLUANT LE PARC FRANÇOIS-DOLLIER-DE-CASSON AINSI QUE SUR LA RUE ST-SULPIC… | 2011-10-19 | 304 725,30 | 278 499,84 | 0,913937 | 6 014,00 | 0,459967 | 7 060,84 | 0,540033 | 13 074,84 | 0,046947 |
| 200101 | 2013-04-08 | EGOU | RECONSTRUCTION D'UN ÉGOUT UNITAIRE DANS L'AVENUE STIRLING, DU BOULEVARD ÉDOUARD-MONTPETIT À L'AVENUE WILLOWDALE. ARRONDISSEMENT: CÔTE-DES-NEIGES-NOTRE-DAME-DE-GRÂCE ET OUTREMONT. | 2012-04-25 | 300 155,90 | 235 159,02 | 0,783456 | 2 545,00 | 0,145120 | 14 992,18 | 0,854880 | 17 537,18 | 0,074576 |
| 1186 | 2013-05-07 | PAVA | PLANAGE ET REVÊTEMENT BITUMINEUX, LÀ OÙ REQUIS, DANS LA RUE JEAN-TALON OUEST ET LE BOULEVARD CAVENDISH (VOIES D'ACCÈS). ARRONDISSEMENT: CÔTE-DES-NEIGES-NOTRE-DAME-DE-GRÂCE. CONTRAT XII (P.R.R. 2011 -… | 2011-08-17 | 342 918,00 | 301 736,04 | 0,879907 | 20 559,84 | 0,970202 | 631,45 | 0,029798 | 21 191,29 | 0,070231 |