Manitoba Capital Plans Project Status (English, CSV)

Manitoba Capital Plans Project Status: English CSV file you can open as a table, filter, chart and export up to 10,000 rows. From Government of Manitoba, updated Apr 2026.

Format
CSV
Access
Table on demand (prepared when opened)
Publisher-reported update
2026-04-22

This dataset contains points showing the locations of the Manitoba Infrastructure's (MI) approved, new, and continuing capital projects for the year 2021/2022. Examples of MI's capital projects are asphalt surface treatment, grading, bituminous rehabilitation, concrete reconstruction, culvert jacking, intersection improvement, structures improvement, traffic signal improvements, and traffic safety improvements. This dataset contains points showing the locations of the capital projects such as asphalt surface treatment, grading, bituminous rehabilitation, concrete reconstruction, culvert jacking, intersection improvement, structures improvement, traffic signal improvements, and traffic safety improvements. This dataset was created by digitizing high-resolution imagery of Manitoba road network, bridge sites, and culvert locations. The details of the capital projects are available as attributes of the dataset. Fields included ( Alias (Field Name): Field description.) ObjectID (OBJECTID): Sequential unique whole numbers that are automatically generated Project # (Project__): A unique ID assigned to a project by MI Capital Project Team. Hwy (Hwy): The highway number where the project…

Access original file

Data overview

Formats
CSV
File languages
English
Available actions
Explore table (prepared automatically) · Access original file

Sample rows

The first 10 rows, as CanQuery read them from the start of the publisher's file on 2026-11-10.

Project__HwyLocation_DescriptionProject_length_in_kmProject_TypeTotal_Project_StatusProject_StatusAnticipated_Construction_Start_DateAnticipated_Construction_Completion_DateMunicipality_NameDepartment_ProgramxyObjectId
C15296034At Cypress River: 2.5km South of PR 2450Structure RehabilitationDesign, 2028, 2029MUNICIPALITY OF LORNEHighway Infrastructure-98.83949.4651
C15301280At Looking Back Creek: 23.7km East of old PR 2800Structure RehabilitationDesign, 2027, 2028Unorganized TerritoryHighway Infrastructure-95.25756.3752
C15311245At Boyne River: 1.3km West of PTH 3 (Carman)0Structure RehabilitationDesign, 2030, 2031TOWN OF CARMANHighway Infrastructure-98.01849.5023
C15316244At Ditch: 6.0km South of PR 2450Structure ReplacementDesign, 2027, 2028MUNICIPALITY OF LORNEHighway Infrastructure-98.54449.4494
C15318101At Red River: 0.7km East of PTH 9 (North Perimeter)0Structure RehabilitationDesignSpring, 2026Summer, 2026RM OF EAST ST. PAULHighway Infrastructure-97.06537549.9683995
C15319001At PTH 50Structure ReplacementDesignSpring, 2027Fall, 2030MUNICIPALITY OF NORTH CYPRESS-LANGFORDHighway Infrastructure-99.36211149.9015996
C15321003At Morris River: 0.4km South of PR 3050Structure ReplacementDesignSpring, 2026Fall, 2027RM OF MACDONALDHighway Infrastructure-97.58128249.5879847
C15322008At Grassmere Drain: 1.0km North of PTH 101 (At Kapelus Drive)0Structure ReplacementDesignFall, 2026Spring, 2027RM OF WEST ST. PAULHighway Infrastructure-97.10083749.9945378
C171860010.5 km E of Brokenhead River--PTH 11 (E/B)26.29999924Surface RestorationDesignSpring, 2026Fall, 2027RM OF REYNOLDSHighway Infrastructure-96.0822849.6624469
C17234001PTH 21--E Jct PR 250 (W/B)17.5Surface RehabilitationConstruction Preparation & PurchasesSpring, 2026Spring, 2027RM OF WHITEHEADHighway Infrastructure-100.36015549.8196410

Official sources and licences

Related open data